Roads and bridges
Road maintenance projects
Below are county-led paving projects and other road maintenance activities for 2025.
You will see crews on site and may have to adjust your travel, but usually for only a brief time. The long-term benefits of these investments include making it safer and easier for you to connect to places using county roads.
Stay informed
- Watch for signs to help guide you safely around work areas
- Sign up to get email updates
- View the 2025 transportation activities map
Repaving
Repaving projects usually last only a few days to a couple of weeks, and most don’t require full closures or detours.
2025 projects
Bloomington
- Bush Lake Road (County Road 28) from Old Shakopee Road (County Road 1) to Chalet Road. Completed
Brooklyn Park, Crystal, and New Hope
- West Broadway (County Road 8) from Cloverdale Avenue North to Lakeland Avenue (County Road 130). Completed
Eden Prairie
- Pioneer Trail (County Road 1) from Trails End Road to Braxton Drive. Completed
Minneapolis
- 42nd Street from Cedar Avenue (County Road 152) to Minnehaha Avenue (County Road 48). Completed
- 45th Avenue North from Xerxes Avenue North to Osseo Road (County Road 152). Completed
- 46th Street from Highway 55 (Hiawatha Avenue) to Minnehaha Avenue (County Road 48). Completed
- Cedar Avenue (County Road 152) from 42nd Street to 52nd Street near Lake Nokomis. Completed
- Hennepin Avenue (County Road 52) from I-35W to Industrial Boulevard. Completed
- Stinson Boulevard (County Road 27) from Hennepin Avenue (County Road 52) to Kennedy Street Northeast. Completed
Minnetonka
- Hopkins Crossroad (County Road 73) from Cedar Lake Road to I-394. Completed
Mound
- Commerce Boulevard (County Road 110) from Commerce Boulevard to Sunny Brook Circle. Completed
Mound/Spring Park
- Shoreline Drive (County Road 15) between Westedge Boulevard and Black Lake Road. Completed
Chip sealing
Chip sealing typically lasts a few days. These improvements don’t require full closures or detours but watch for lane closures and flaggers.
2025 projects
Brooklyn Park
- Zane Avenue North (County Road 14) from Brooklyn Boulevard (County Road 152) to Highway 610
Eden Prairie
- Eden Prairie Road (County Road 4) from Hilltop Road to Terrey Pine Drive
- Eden Prairie Road (County Road 4) from Westgate Drive to North Hillcrest Court
Minnetrista
- County Road 15 from Market Avenue to Westedge Boulevard
Orono/Plymouth
- 6th Avenue North (County Road 6) from Highway 12 to Olive Lane
Pedestrian ramps and accessible pedestrian signals
We are updating intersections on county roads where we are doing repaving work to meet accessibility needs. This work is guided by our Americans with Disabilities Act plan and completed in partnership with others. We will add new projects throughout the 2025 construction season.
These projects typically take a few weeks to complete.
2025 projects
Bloomington
- West 98th Street/Old Shakopee Road (County Road 1) at Grand Avenue
- Old Shakopee Road/24th Avenue (County Road 1) from Meadowview Road to 79th Street
- Old Shakopee Road (County Road 1) from Yukon Avenue to Louisiana Avenue
Brooklyn Center
- Bass Lake Road (County Road 10) at Northway Drive West and Northway Drive East
Champlin
- Elm Creek Crossing (County Road 121) at South Creek Circle
- West Hayden Lake Rd (County Road 121) from Cartway Road to Champlin Drive
- Winnetka Avenue (County Road 103) at 117th Avenue North
Crystal/New Hope/Brooklyn Park
- West Broadway Avenue (County Road 8) from Cloverdale Avenue to 60th Avenue North
Dayton
- West River Road (County Road 12) at Balsam Lane
Eden Prairie
- Pioneer Trail (County Road 1) from Settlement Drive to Stable Path
Edina
- York Avenue (County Road 31) at Parklawn Avenue
Golden Valley
- Winnetka Avenue (County Road 156) from Highway 55 to Orkla Drive
Maple Grove/Plymouth
- Hemlock Lane (County Road 61) from Gramercy Park Driveway to north of 71st Place North
Medina
- Pinto Drive (County Road 116) from Meander Road to Foxberry Farms Road
Minnetonka
- Hopkins Crossroad (County Road 73) between the I-394 westbound ramps and Oak Knoll Terrace South
Minneapolis
- 45th Avenue North (County Road 9) between Upton Avenue and Russell Avenue
- Cedar Avenue (County Road 152) between 3rd Street and 9th Street
- Cedar Avenue (County Road 152) between 43rd Street and 52nd Street
- East Hennepin Avenue (County Road 52) from 15th Avenue Southeast to 29th Avenue Southeast
- Franklin Avenue (County Road 5) between 22nd Avenue and West River Parkway
- Hennepin Avenue (County Road 52) at the post office entrance
- University Avenue (County Road 36) from 25th Avenue Southeast to Clarence Avenue Southeast
Shorewood/Tonka Bay
- Smithtown Road (County Road 19) from Shorewood Lane to Smithtown Road/County Road 19/Manitou Road intersection
Spring Park
- Shoreline Drive (County Road 15) at West Arm Road
Traffic signals
In 2026, Hennepin County is replacing traffic signal poles and light components at 20 intersections across the county. By upgrading items that are nearing the end of their planned service life, we continue to provide safe and reliable travel for all the people who use the roads, sidewalks, and trails.
Here’s what you can expect:
- Updates will be completed between February and May.
- We’ll install advance notification signs at each location about a week prior to the start of work.
- Work at most sites will take about two weeks, which includes time for the concrete to cure.
- Intersections will function as an all-way stop—using either a flashing red light or stop signs—during the installation.
- We’ll close some lanes so crews can safely complete their work.
- You may experience delays, particularly during peak hours.
Noticeable benefits include:
- New signals with better visibility
- Better access for people walking and rolling with upgraded pedestrian push buttons
- New metal poles set in concrete foundations
- Brighter streetlights
Permanent signals
Bloomington
- Normandale Boulevard (County Road 34) and 84th Avenue South (March)
- Old Shakopee Road (County Road 1) and 34th Avenue South (TBD)
- Old Shakopee Road (County Road 1) and Logan Avenue South (TBD)
- Penn Avenue South (County Road 32) and 84th Avenue South (TBD)
- Old Shakopee Road (County Road 1) and Garfield Avenue South (February)
- Old Shakopee Road (County Road 1) and Grand Avenue South (February)
- Normandale Boulevard (County Road 34) and West 94th Street (February)
Brooklyn Park
- Zane Avenue North (County Road 14) and Crestview School driveway (February)
Crystal
- West Broadway (County Road 8) and Douglas Drive North (County Road 102) (February)
- West Broadway (County Road 8) and Bass Lake Road (County Road 10) (March)
- Bass Lake Road (County Road 10) and Sherburne Avenue North (March)
Eden Prairie
- Pioneer Trail (County Road 1) and Franlo Road (TBD)
Edina
- Pioneer Trail (County Road 1) and Franlo Road (TBD)
Golden Valley
- Medicine Lake Road (County Road 70) and Boone Avenue North (February)
- Medicine Lake Road (County Road 70) and Nevada Avenue North (February)
- Winnetka Avenue (County Road 156) and Olympia Street North (February)
Hopkins
- Excelsior Boulevard (County Road 3) and 5th Avenue South (March)
New Hope
- West Broadway (County Road 8) and 63rd Avenue North (March)
- Bass Lake Road (County Road 10) and Winnetka Avenue North (County Road 156) (February)
- Winnetka Avenue (County Road 156) and 47th Avenue North (February)
Richfield
- Penn Avenue South (County Road 32) and 64th Avenue South (TBD)
St. Anthony
- New Brighton Boulevard (County Road 88) and St. Anthony Boulevard (March)
- Silver Lake Road (County Road 136) and St. Anthony Boulevard (April)
Temporary signals
We’ll also be installing new traffic signals at several intersections which are scheduled for major construction or improvements in the next few years. At these locations, new signals will be installed on wooden poles, which will be replaced with permanent metal structures during the future road project. Traffic impacts will be minimal and brief.
Bloomington
- Old Shakopee Road (County Road 1 and Old Cedar Avenue South (February)
- Old Shakopee Road (County Road 1)) and Lyndale Avenue South (February)
Crystal
- West Broadway (County Road 8) and 55th Avenue North (February)
Richfield
- Nicollet Avenue (County Road 52) and West 65th Street (February)
Signal pole replacements
At about 20 additional intersections, we will replace only the traffic signal poles. Those locations are not listed, since the work has minimal impact and is typically completed within a single day.
Project contact
dispatch@hennepin.us
612-596-0299
Other road projects
Other road projects in your area may be led by your city or town, various utility companies, or the Minnesota Department of Transportation.
Minneapolis (North Loop)
Early February through mid-April
Drainage maintenance work beneath the intersection of Washington Avenue (County Road 152) and North 8th Avenue.
Crews will enter and exit the work area from an access point on North 2nd Street. This access point is one block over and south of North 8th Avenue.
A short section of the bike lane on the east side of North 2nd Street will close. Several metered parking spots will also close.
All work is coordinated with the City of Minneapolis.
Project contact
Josh Jansen
Joshua.jansen@hennepin.us
612-235-1334